Search This Blog

Friday, 23 February 2018

T/369(3b) – AUTHORITY TO PASS DEFECTIVE STOP SIGNAL AT ON

Add caption

 T/369(3b) – AUTHORITY TO PASS DEFECTIVE STOP SIGNAL AT ON
Ø  This shall be used at the Station where the Signal is defective.
Ø  For Reception Signal piloting is not necessary.
Ø  For Starter or Advanced Starter protecting a point, PHS at the foot of the Signal is compulsory.
Ø  More than one Signal may be authorised to pass at ON in one single form.
Ø  Speed shall not exceed 15 kmph while passing the Signal.
Ø  If LSS alone failed, an endorsement stating LC obtained from station in advance along with PN is also mentioned on this form.
Ø  Shall be issued to pass IBSS at ON also.


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...