During Single Line working on Double Line when
communication is available.
Ø For the First Train
in the right direction and for all trains in the wrong direction-LCT (Speed 25kmph)
Ø For subsequent
trains in the right direction.
Ø SM shall advise the
SM at the other end the No and description of each train and get individual PN.
Ø LP shall observe
Auto signalling and proceed in the usual manner.
Single Line working on Double Line during
Total Interruption of communication.
Ø
For
the Engine sent for opening communication T/B 912 and T/B 602 with items 1 to 3
deleted.
Ø
For
subsequent trains – CLCT (T/G 602 or T/H 602) Speed of subsequent trains shall
be restricted to 25kmph when view ahead is clear and 10kmph when view ahead is
not clear.