Search This Blog

Thursday, 22 February 2018

Single Line working on Double Line during total interruption of communication (S.R. 9.12(iv))


Single Line working on Double Line during total interruption of   communication (S.R. 9.12(iv))

Ø  Movement of trains on the affected section shall be controlled by such stations and on such lines as prescribed by special instructions.
Ø  Communication shall be opened by sending a light engine, Train Engine Motor trolley, tower wagon, Diesel Car, Rail Motor Car or EMU rake.
Ø  SM shall handover to the LP the following documents-

(a)  An authority to proceed without line clear (T/B 912)
(b)  A Line clear enquiry message for the waiting train.
(c)  A conditional line clear message for the return journey of the engine with or without train.

         Note- For items (b) and (c) T/B 602 with the first three portions scored out and issued.
Ø  An endorsement shall be made in the caution order issued to the LP of the first train to inform all Gatemen or Gangmen on the way about the introduction of Single Line working and the line on which the train is running.
Ø  Speed shall be restricted to 25 kmph over straight and 10 kmph over curve.
Ø  If the engines/vehicles meet in the midsection LP shall take a decision regarding to which station the vehicles should move based on the importance of the Train, distance, presence of Catch siding etc.
Ø  On arrival at the next station nominated under special instructions LP shall hand over T/B 602 to the SM.
Ø  SM shall issue the following documents to the LP while returning-
(d)  Conditional Line clear ticket (T/G 602 or T/H 602)
(e)  Conditional Line Clear Reply Message.(T/F 602)
(f)   Enquiry message for the expected trains if any (T/E 602)
(g)  A caution Order.

Ø When approaching the next station nominated under special instructions, the LP shall bring his train to a stand outside the first stop signal of the correct line or opposite to the last stop signal pertaining to the wrong line whichever he comes across first and sound one long whistle.
Ø SM shall arrange for a man in uniform to pilot the train. Manual/ Semiautomatic stop signals if any shall, however, be passed at “ON” on the prescribed authority T/369(3b).
Ø On arrival at the station LP shall hand over the conditional line clear reply message (T/F 602) to the SM.
Ø  SM shall start the waiting train by issuing a conditional line clear ticket.
Ø  If the SM has more than one train to despatched in the same direction, a line clear enquiry message in Form No. T/E 602 shall also be issued along with T/B 912 & T/B 602 when the engine is sent for opening communication.
Ø  After obtaining line clear for the trains, the trains will be started on Conditional Line Clear Ticket (T/G 602 or T/H 602). Following trains will be started at time interval of 15 minutes with a speed restriction of 25 kmph when view ahead is clear and 10 kmph when view ahead is not clear.

Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...