Search This Blog

Saturday, 20 January 2018

Total Interruption of Communication on Single Line {6.02(ii)}


Total Interruption of Communication on Single Line {6.02(ii)}

         When all the authorized means of communication has failed and Line Clear could not be obtained through any one of the following means of communications, Total Interruption of Communications is said to prevail between the two block stations.
a)    Block Instruments/Track circuits/Axle counters.
b)   Telephone attached to Block Instruments
c)    Station to Station fixed telephones
d)   Fixed telephones like Rly Auto phones and BSNL phones
e)    Control Telephones &
f)     VHF sets not as sole means of communication in sections where passenger trains run.
     SM shall call GDR and brief them about the situation and communication to be established with the SM at the other end of the block section by sending any of the following in the order of preference.
                     i. Light Engine
                   ii. Train Engine after detaching from the waiting train.
                  iii.  Motor trolley /Tower wagon
                  iv.  Trolley/Moped trolley
                    v.  EMU train/RMC after detraining the passengers.SM shall prepare Form T/B 602 and issue to LP under acknowledgement.
               It contains:
·      An Authority To Proceed without Line Clear.
·      Authority to pass dispatch signals at ON.
·      Caution Order restricting speed to 15 kmph by day and view ahead clear 10 kmph by night and view ahead not clear & walking speed during   impaired visibility such as thick or foggy weather.                                                           
·      Line Clear Enquiry Message
·      Conditional Line Clear Message
Ø  The LP running with the authority T/B 602 shall switch on the flasher light and be vigilant and cautious and frequently use the engine whistle.
Ø  The LP shall not exceed the speed of 15/10kmph (Day/Night), or
Ø  Walking speed during thick or foggy weather two men to walk in advance at an adequate distance and pilot the train carrying Hand danger signals and Detonators.
Ø  Before entering tunnel, ensure it is free from any obstruction and head lights, side lights, tail lights should be lit,
Ø  No obstruction on the line beyond outermost facing points shall be permitted by the SM until the engine returns.
Ø  In case of two engines or any other vehicles meeting in mid section, LPs to decide to which station to proceed considering the importance of waiting train, distance, gradient and presence of catch siding etc.
Ø  After deciding which direction to proceed they may couple up if possible or follow at an adequate distance.
Ø  On arrival SM shall cancel the T/B 602 issued by him.
Ø  The Engine sent to open communication on approaching the station in advance shall stop at the FSS of the station and give a long whistle to apprise the SM.
Ø  Even after waiting for 10 mins there is no response from the SM the LP shall depute his ALP to the station to inform the SM.
Ø  SM on becoming aware may receive the train on signals.
Ø  LP to handover from T/ B 602 to SM.
Ø  SM shall issue Conditional Line Clear reply granting line clear with PN in form T/ F 602.
Ø  CLCT T/G 602 for up direction and T/H 602 for down direction to be given for the engine to return with or without train attached.
Ø  In case of trolley, it can be loaded in the train
Ø  While returning the Engine / train shall run at booked speed.
Ø  LP to stop at foot of the FSS of sending station.
Ø  SM has to arrange reception by taking off signals.
Ø  On arrival LP to hand over conditional line clear reply message to SM.
Ø  Waiting train shall be started on CLCT and it can run at booked speed.
Ø  In case of even flow of trains, for every succeeding train, Further Enquiry and Reply shall be sent through guard of the preceding train.
Ø  In case of uneven flow of trains, Line Clear shall be obtained through first engine or trolley in form T/E 602.
Ø  In this case, second and subsequent trains to be started at a clear interval of 30mins.
Ø  Speed of the first train-Booked speed
Ø  Subsequent trains -25/10 kmph - view clear/ not clear.
Ø  The particulars of train which has preceded and the train which will be following shall be indicated in the CLCT.
Ø  If a train is unable to proceed further due to any accident / failure / obstruction, Guard to check up Tail board/ Tail lamp.
Ø  Place one detonator at 250 mts on the way out and two detonators 10 mts apart at 500 mts from train.
Ø  When trains follow one another, normally no train shall be backed.
Ø  If unavoidable, it can be backed, after arranging protection from the place up to where it has to be backed.
Ø  This procedure to be followed until anyone of the means of communications is restored.
Ø  If any authorised means of communications is restored by the competent authority and after ascertaining that the block section is clear, the restoration message should be duly exchanged in form T/I 602 by both the Station Masters before resuming normal working.
Ø  TI shall scrutinize records and submit a report to DRM within 7 days of occurrence.


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...