Temporary single line working on Double line {S.R.6.02 (iv)}


Temporary single line working on Double line {S.R.6.02 (iv)}

Ø  Working of trains on one line of D/L section due to obstruction/accident or any other reason on adjacent line shall be introduced.
Ø  Trains can be operated by any one of following procedure
Ø  By obtaining Line clear on electric communication instruments (short duration)
Ø  By the installation of Single Line Block Instrument (Long duration)
Ø  To introduce temporary Single Line working on Double Line the SM should receive written advice from a competent Engineering official and then consult with controller and SM at the other end.
Ø  TSL working shall be introduced between two nearest stations where the crossover between UP and DOWN lines is provided on either side of the obstruction.
Ø  The Block Instruments at the intermediate stations shall be kept locked in the TOL (Train on Line) position.
Ø  Any C class station shall be temporarily closed during the entire period of TSL working. The signals shall be kept at ON and the same can be passed under written authority of the SM of either end (T/D 602).
Ø  If the trains are running on the right line, the LSS shall be kept at ‘ON’ and if the trains are running on the wrong line, all departure signals shall be kept at ‘ON’.
Ø  Before introduction, the SM proposing S/L working shall issue message containing the following to the SM at the other end.
o   Cause of introduction of S/L working
o   The line on which the S/L working is proposed
o   Source of information that the said line is clear
o   Location of obstruction
o    Speed restrictions, if any
o   Names of intermediate C class stations closed
o   Assurance that the trap points are set for the said line and spiked.
o   The number and timings of the last train which arrived or left the block station issuing the message.
Ø  On receipt of acknowledgement from the SM confirmed by PN, the TSL working is introduced and Line Clear will be obtained on electrical speaking instruments.
Ø  SM shall issue the authority T/D 602 to GDR.
Ø  A Caution order issued for each train stating
o      The line on which the train is to run.
o   The Km/Posts between which the obstruction exists
o   Speed restriction if any
o   Assurance that trap points if any are set properly and spiked.
Ø  The LP of the First Train to inform all Gatemen and gangmen on the way about the introduction of TSL working and the line on which the trains will run.
Ø  LP shall switch on the Flasher light while running on the wrong line.
Ø  The speed of the first train shall not exceed 25 kmph and subsequent trains may run at booked speed.
Ø  When train is running on right line – Except LSS, all signals may be taken off.
Ø  When the train is started on wrong line – The trains shall be piloted out of the station on form T/511 after all facing and trailing points are secured correctly up to the last set of points.
Ø  On reaching the next station, the LP shall stop at FSS pertaining to the right line or at LSS pertaining to the wrong line whichever comes across first.
Ø  Trains running on right line may be received on signals.
Ø  Trains running on wrong line SM shall arrange to pilot the train into the station on written authority through a competent railway servant.
Ø  The Engineering officials shall intimate the SMs stating that the obstructed line is free and safe for passage of trains.
Ø  SM shall inform the message to SM of station at other end and exchange PN.
Ø  SM introduces normal working, after consulting with section controller and after the last train which entered section during TSL working cleared section.
Ø  The Block instruments shall be brought into use.
Ø  The intermediate stations which have been closed shall be again brought in to operation.
Ø  An entry to be made in TSR at all stations, showing time of D/L working suspended and time of S/L working introduced and time of normal working resumed.
Ø  LP of the first train after the resumption of normal working shall inform all Gatemen and Gangmen on the way regarding the restoration.
Ø  The TI shall scrutinize all records and submit his report to the DRM with in 7 days of resumption of normal working.