Accident
Relief Medical Equipments
There are two types of Medical
equipments namely, Scale I and Scale II. The Scale I equipment is stored in
special Medical relief vans and Scale II equipments is stored in boxes in
special rooms on the station platform. The list of stations provided with Scale
I or Scale II equipments are indicated in the WTT.
Keys of MRV shall be with SMR and
DMO. Inspection by depot supervisors once in a month and inspection by
Divisional officers once in 3 months. A trial run shall be run once in three
months. MRV shall not be run without Railway Doctors. The vehicles shall be
tested by Mechanical department every week.
Turning-out time from the time of Accident
Siren
From single exit siding/Terminal stations –
25 minutes.
From Double exit siding- 20 minutes.
Preference shall be given to run ARMV scale-I
on top priority. If MRV is not required
to run due to obvious reasons it shall be cancelled only by DRM.
Scale II Equipments
are stored in boxes in special rooms in platform of certain important stations.
This is inspected by ADMO of depot once in a
month and inspected by DMO once in a year.
Break-Down
Special
Ø Stabled in a
suitable siding set apart exclusively for the purpose.
Ø Keys of Engineering
tool van are with SSE/P.Way.
Ø Keys of Mechanical
tool van are with SSE/C & W.
Ø Duplicate keys of
both the tool vans are kept in separate sealed glass fronted box in SMR office.
Ø Inspected by Depot
Supervisors once in a month.
Ø Inspection by
Divisional officers once in 3 months.
Ø Trail run is
conducted once in 3 months..
Ø Turning-out time
from the time of siren sounding
From 6.00 hrs to 18.00 hrs - 30 minutes.
From 18.00 hrs to 6.00 hrs - 45 minutes.
Accident
Forms
ACC-3: Accident report by GDR to the
nearest SM.
ACC-4: GDR report when a person/persons
falling out of trains or
knocked down by train.