Search This Blog

Tuesday, 26 December 2017

Reception of a train on an obstructed Road. (GR/SR 5.09)

Reception of a train on an obstructed Road. (GR/SR 5.09)

In the event of a train being received on an obstructed line,
Ø  Loco pilot to be informed through SM in rear, whenever possible.
Ø  Train to be stopped at the relevant signal.
Ø  SM to ensure the following – 
Ø  Line of reception is clear up to the point of obstruction.
Ø  All the relevant points are correctly set and facing points locked.
Ø  LC gates if any are closed against road traffic.
Ø  Conflicting signals are at ON.
Ø  Conflicting movements are stopped.
Reception shall be arranged.
Ø  By taking off Calling-On Signal where provided speed not to exceed 15 Kmph.
Ø  By issuing a message supported by PN through SPT (Speed not to exceed 10 Kmph).
Ø  By issuing the authority T/509 through a competent railway servant and piloting.
Ø   Loco pilot shall stop the train at the facing point leading to the reception line until hand signalled.
Ø  A stop hand signal shall be exhibited at a distance of 45 mts from the place of obstruction. Loco pilot shall proceed cautiously and be prepared to stop short of any obstruction.

Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...