Detaching
engine from a train outside station limits (GR/SR 4.48)
Ø The engine of a
passenger carrying train shall not be detached except in an emergency such as
testing a bridge, for isolating a burning coach on a train carrying passengers
or to send a serious accident message.
Ø Hand brakes in the
Guard`s brake-van in rear and in other SLR wherever provided shall be securely
screwed on,
Ø Hand brakes of any
goods wagons on the train shall be securely pinned down.
Ø Hand brakes if
provided on any coaching vehicle shall be applied.
Ø The wedges/sprags
provided in the guards BV shall be securely jammed under the farther most
wheels of the rake in the direction of falling gradient.
Ø Vacuum/Air pressure
shall be created to the maximum extent possible.
Ø The interval between
the engine is detached to the time it is again attached to the train shall not
exceed 45 minutes.
Ø The LP of a goods
train shall, before detaching his engine from the train, call for the Guard to
apply brake by giving three short whistle.
Guard
shall apply the brakes as under:-
Sl.No
|
Gradient
|
Inside
station limits
|
Outside
station limits
|
1
|
Steeper than 1/400
|
HB of BV + HB of 12 V
|
HB of BV + HB of all Vehicles
|
2
|
Steeper than 1/600 up to 1/400
|
HB of BV + HB of 6 V
|
HB of BV + HB of all Vehicles
|
3
|
1/600 or flatter
|
HB of BV
|
HB of BV + HB of 18V
|
4
|
1/150
or steeper for Roller bearing Vehicles &
1/100
or steeper for non-roller bearing vehicles
|
Outside
station limits
HB of BV + HB of Loco + HB of 1/3 vehicles whichever is more (at least 10 vehicles
inside loco and 5 vehicles inside rear BV)
|
Note:
If BV
to be detached additional 6 vehicles HB to be applied.