Search This Blog

Saturday, 23 December 2017

Detaching engine from a train outside station limits (GR/SR 4.48)


Detaching engine from a train outside station limits (GR/SR 4.48)

Ø  The engine of a passenger carrying train shall not be detached except in an emergency such as testing a bridge, for isolating a burning coach on a train carrying passengers or to send a serious accident message.
Ø  Hand brakes in the Guard`s brake-van in rear and in other SLR wherever provided shall be securely screwed on,
Ø  Hand brakes of any goods wagons on the train shall be securely pinned down.
Ø  Hand brakes if provided on any coaching vehicle shall be applied.
Ø  The wedges/sprags provided in the guards BV shall be securely jammed under the farther most wheels of the rake in the direction of falling gradient.
Ø  Vacuum/Air pressure shall be created to the maximum extent possible.
Ø  The interval between the engine is detached to the time it is again attached to the train shall not exceed 45 minutes.
Ø  The LP of a goods train shall, before detaching his engine from the train, call for the Guard to apply brake by giving three short whistle.


Guard shall apply the brakes as under:-

Sl.No
Gradient
Inside station limits
Outside station limits
1
Steeper than 1/400
HB of BV + HB of 12 V
HB of BV + HB of all Vehicles
2
Steeper than 1/600   up to 1/400
HB of BV + HB of 6 V
HB of BV + HB of all Vehicles
3
1/600 or flatter
HB of BV
HB of BV + HB of 18V
4
1/150 or steeper for Roller bearing Vehicles &
1/100 or steeper for non-roller bearing vehicles
 Outside station limits
 HB of BV + HB of Loco + HB of 1/3 vehicles  whichever is more (at least 10 vehicles inside loco and 5 vehicles inside rear BV)

    Note: If BV to be detached additional 6 vehicles HB to be applied.





Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...