Search This Blog

Saturday 30 December 2017

Precautions for shunting



Ø  Proper instructions shall be obtained from SM/YM or shunting staff.
Ø  Proper authority for shunting must be given - Shunt Key or Shunt Metal Token with T/806.
Ø  Where shunting is governed by taking off starter/shunt signal for onward movement and return movement by taking off shunt signal issue of T/806 is not necessary.
Ø  If Fixed Signal available, that can be taken off
Ø  If no fixed signal is available, hand signal must be given and with oral instructions
Ø  In case of conflicting signals LP shall stop immediately.
Ø  Speed of shunting – 15 kmph in general and 8 kmph for Explosive wagons
Ø  Point Indicator and Trap indicator must be observed wherever provided.
Ø  When loading and unloading is going on – No shunting
Ø  If necessary the load must be evenly distributed and shunting performed
Ø  When a full passenger train, part of Passenger train, full goods train, part of goods train, full mixed train, part of mixed train and passenger Coach with passengers are shunted, the Facing points must be locked with available locking device.
Ø  Engine movement from loco to Traffic Yard and Traffic yard to loco is also shunting and speed is 10 kmph.
Ø  When a full or part of a train is shunted Guard must be in the Brake Van
Ø  Where Shunting permitted indicator is available it must be used.
Ø  When a passenger coach with passengers is shunted, passengers must be warned.
Ø  During shunting, for manning of points, a series of points may be manned by one person.

Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...