Search This Blog

Friday, 29 September 2017

Before starting a train check power data to ensure normal loco power


Apply SA9 to Full Application
Ensure ER & GF Slider Switches in ON position
Keep Isolation Switch in RUN
Keep RH in Direction
Select Power Data / Motoring Screen in DID display
Observe MGV & MGF Values
MGV should be above 600 V and MGF should be above 10 A

If MGV is above 600 V,
Take one Traction Notch
Check 30 / 50 KN indication in TE Meter (P4 / G4)

Check Power Data screen
Tor Ref & Tor Feedback values are equal for both Trucks
Note: Ensure loco brake power before moving LE


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...