Search This Blog

Sunday 14 January 2018

Sending Relief Engine / MRV to accident spot during Line Block


Sending Relief Engine / MRV to accident spot during Line Block
Ø  When the block section is obstructed due to Accident or engine failure or        any other reason, any number of relief trains may be sent on T/A 602
Ø  When the block section is obstructed by Engineering department, only material trains and Motor Trolley and departmental trains may be started on T/A 602.
Ø  SM has to examine the TSR, WTT, Train Notice register, Caution order register and other relevant registers and contact controller on duty and the SM at the other end.
Ø  The location of engine, BV and the LV shall be mentioned in T/A 602.
Ø  Speed not to exceed 15/10 (Day/Night) on both S/L and D/L.
Ø  When approaching the station, LP to stop the train at the FSS on S/L. On D/L (wrong direction) stop at the foot of LSS of the same line or opposite to FSS of the adjacent line, whichever comes first and the train must be received by piloting on a written memo.
Ø  On arrival at the station SMs to exchange messages with PN.


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...