Search This Blog

Wednesday 31 January 2018

Rules for clearing stabled stock from a way side station


Rules for clearing stabled stock from a way side station

1)   While stabling a train at a wayside station the LP shall handover the BPC to the SM, who shall in turn handover the same to the outgoing LP or when the stock is cleared subsequently.
2)   If such a stabled stock is cleared within 24hrs of stabling, The BPC shall remain valid; in such cases the GDR shall ensure vacuum/Air pressure continuity before starting the train.
3)   When the stock is not cleared within 24hrs of stabling the BPC shall   become invalid.
4)   In such cases the GDR shall conduct a safety check and take the train to the nearest Train examination yard for train examination and issue of fresh BPC.
5)   When a train has to be started from a wayside station without BPC the GDR shall conduct a minimum safety check as follows-
Ø After attaching the train engine the LP shall create the required amount of vacuum/Air pressure on the formation and destroy vacuum fully or make a service application of Brakes.
Ø The GDR shall jointly walk along the full length of the train one on either side to check the effectiveness of Brake power.
Ø They shall also ensure that all the couplings are properly locked and there are no loose, missing or broken fittings such as brake gear pins, draw gear pins, springs etc which may endanger the safety of the train.
Ø After satisfying that the Brake power is adequate and the wagons are safe for further movement the LP shall recreate the required amount of vacuum/Air pressure before starting the train. The crew shall ensure all the cylinders are in released condition.
Ø The crew shall also ensure that all wagon doors are closed/latched before starting a train.
Ø When a train is formed enroute the guard and LP shall advise the control for arranging train examination and issue of fresh BPC at the next Train Examination yard.
Ø Where despite a change in composition the BPC is valid, the LP shall create the required amount of vacuum/Air pressure in the leading Engine and rear BV and the GDR shall conduct the vacuum/Air continuity test.
Ø After ensuring that a minimum of 75% of Brake power is available GDR shall start the train.
Ø GDR shall prepare a memo in triplicate mentioning that adequate brake power is available and the train is fit to run.
Ø This GDR memo is valid up to the next Train examination point in the direction of run.
Ø A train being cleared from an unloading point shall be offered for Train Examination and issue of BPC at the nearest Train examination yard.                                                                                            Note: These rules shall not be applicable for closed circuit rakes having return BPC.
Ø Wagons attached from a no: of wayside stations shall be started from each station after the safety check by the GDR.                                                                                     
                Note: This shall not apply to wagons certified fit by C & W staff with a fit memo.
Ø  Whenever wagons are attached or detached from a Goods train enroute the guard and LP shall check the train for adequacy of Brake power and vacuum/Air pressure level.
Ø  The validity of the original Brake power certificate of the train will remain valid if the change in composition is only Ten four wheeler units or less in case of vacuum braked trains and two wagons/vehicles or less in case of Air-Braked Trains.


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...