Search This Blog

Thursday, 23 November 2017

Reception stop signal failure


      SM shall ensure the following before receiving a train.
Ø  The line on which the train is to be received shall be kept clear and free from obstruction up to berthing place.
Ø  All the points for the nominated line shall be correctly set and facing points locked.
Ø  LC gates, if any shall be closed against the road traffic.
Ø  All conflicting movements shall be stopped.
Ø  All conflicting signals shall be kept at ‘ON’.

Reception of trains shall be arranged during signal failure
Ø  By taking ‘ off’ ‘Calling ON’ signal where provided, or
Ø  By issuing a message supported by a PN to the Loco pilot through SPT where provided, or
Ø  By issuing the authority T/ 369 (3b) & delivered by a competent railway servant at the foot of the defective signal.
Ø  By issuing advance authority T/ 369 (1) at nominated station or by SM of station in rear and exhibiting PHS at the foot of the defective signal.

Reception on Calling- on signal
Ø  The train has to come to a stop at the foot of the FSS.
Ø  SM to ensure the above said five conditions before clearing Calling-ON Signal.
Ø  LP shall draw ahead & keep his train well under control and pass the signal at a speed not exceeding 15 kmph.

Signal Post Telephone
Ø  LP shall contact SM through SPT.
Ø  SM shall observe the above said 5 conditions and issue a message through SPT supported by PN.
Ø  Message shall contain Train No, Signal No. line No, PN and speed.
Ø  The LP shall record the message in the rough journal book and pass the defective signal(s) at ‘ON’ at a speed not exceeding 15 KMPH.

T/ 369(1)
Ø  This authority is issued by SM of Nominated station/station in rear.
Ø   For the purpose of issuing T/369 (1) to goods trains/LE the station immediately in rear is the nominated station.
Ø  T/369(1) is prepared in duplicate in prescribed format and issued to the LP under acknowledgement.
Ø  SM shall fulfill all conditions for clearing reception signals before granting line clear for the train approaching with T/369(1).
Ø  SM shall arrange to exhibit PHS at the foot of the defective signal.
Ø  The LP shall not pass the signal without PHS.
Ø  The speed of the train with T/369(1) while passing the reception stop signal at “ON” shall not exceed 15 KMPH.
Ø  If the reception stop signal is restored, SM after stopping the train at the foot of the signal shall issue a written memo to the LP to obey the off aspect of the signal.
Ø  T/ 369(1) shall not be issued in the following cases.
(a)  When calling ON signal is provided.
(b)  When a SPT is provided.
(c)  When all Home signals have not failed.
(d)  When signal failed in off aspect/no light due to power supply failure.
(e)    In Automatic area if manual home signal is not provided.

T/369(3b)

Ø  This authority shall be prepared and issued by the SM at the station where the signal has failed.
Ø  LP to stop the train at the foot of the signal.
Ø  SM after fulfilling the conditions for taking off the reception signal shall prepare this authority in duplicate and arrange to hand over to the LP through a competent railway servant.     
Ø  Competent Railway servant shall hand over T/369(3b) to the LP, who shall take the original and sign in the duplicate. Piloting is not necessary.
Ø  The LP shall pass the defective signal(s) at ON and proceed cautiously at a speed not exceeding 15 Kmph.


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...