Search This Blog

Wednesday, 1 November 2017

FP Pressure not building up


  •  Ensure sufficient MR pressure in display
  •  Check FP feed valve inlet & Outlet COCs  are in Open position
  •  Check FP Angle COCs & additional COCs
  •  FP leakages in formation
  •  Adjust feed valve & try
  •  Tap FP feed valve & duplex valve

MU Loco Setup
Equipment
Lead Loco
Trail Loco
A9 & SA9 COC in Working C/s
Open
Both C/s Closed
A9 & SA9 COC in Non-Working C/s
Close
BP Charging COC
Open
Close
MU2B
Lead
Trail
Ensure all hose pipes are connected & their COCs are open between the locos and MU jumper cable connected and secured properly
MFPB, GFS, MCB in both C/s
(VCD disable switch in GE)
ON
OFF

Set up for MU Lead Loco Failure
Keep MB1, MB2, MPCB (CCBSB) in ON
Keep required lighting breakers only ON  
Keep all other breakers in OFF
Keep ECS in IDLE
Both C/S Switches and Breakers in ON
No change in COCs position
LAM will not indicate.
Clear section, contact shed

Set up for MU Trailing loco failed
No change in any COCs position
Shut down the rear loco
Keep the Breakers and switches in OFF position
Open BS

DH / Banker Loco setup
Equipment
Position
SA9 COC in Working C/s
Open
A9 COC in Working C/s
Close
A9 & SA9 COC in Non-working C/s
Close
BP Charging COC
Close
MU2B
Lead

Moving IRAB Loco in Idle with only BP / FP pipe attached

  •  Couple the locos and ensure proper locking of CBCs
  •  Keep MU2B in LEAD
  •  Keep MCBs OFF in both C/stands  (VCD disable switch in disable position in GE Mcp Loco)
  •  Close BP Charging COC
  •  Ensure C3W Distributor valve isolating COC in open condition
  •  Operate A9 in Lead loco & ensure Conjunction brake application & Release in Trail loco

Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...