Search This Blog

Tuesday 13 February 2018

Operating forms used in Automatic Area only



     T/A 912

o   It is an authority issued to the LP to pass intervening  Automatic/Semi automatic/Manually operated/ Gate Stop Signal at “ON”.                     Semi-Automatic/Manual operated/Gate stop signals shall be passed at `ON’ only by observing PHS at the foot of the signal. Distinguishing Nos of the signals to be passed at “ON” shall be mentioned in the authority.
o   It is issued along with T/C 912. It is also issued along with LCT for wrong direction trains during Single Line working on Double Line. It is prepared in duplicate.

      T/B 912

          It is authority to proceed without LC issued in Automatic block system.
              It includes 3 Authorities-
 1.  Authority to proceed without Line Clear.
 2.  Authority to pass departure Signal at “ON”
 3.  Caution Order.
       Speed of all trains dealt on this authority shall be restricted to 25 kmph over straight and 10kmph over curve.
         It is issued during the following occasions.
1.  During TIC in Double Line Automatic area.
2.  During Single Line working on Double Line during TIC for the   
     Engine sent for opening communication.

      T/C 912

          It is issued for the Engine/Train to enter the obstructed block section in Automatic Area. It includes only Two Authorities-
 1. Authority to proceed without LC.
 2. Caution Order.
     Separate authority to pass LSS at “ON” (T/A 912) shall be issued.
     Speed of all trains dealt on this authority shall be restricted to 25kmph over straight and 10 kmph over curve.
     It is issued in the following occasions.-
              1. When the block section is obstructed due to accident.
              2. When Line Block is in force and non Traffic trains like Material Train, Trolley, Lorry, Motor Trolley etc has to be sent.

     T/D 912

         It is issued as authority to proceed for the train during prolonged failure of signals when communication is available in automatic area.
         Only one train will be permitted in the section at a time. LC must be obtained for each train.
         Speed of all trains proceeding on this authority shall be restricted to     25kmph. It includes three Authorities-
                 1.   Authority to proceed.
                 2.   Authority to pass intervening signals at “ON”.
                 3.  Caution Order.
          At the receiving end LP shall stop the train at FSS and SM shall depute a competent Railway servant to pilot the train.

Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...