Search This Blog

Thursday, 12 October 2017

Instructions to LP/ALP


·      Ensure Additional BP COCs are open at both ends while taking over charge
·      Conduct BP continuity test as per instructions
·      Conduct brake feel test immediately after starting
·      Conduct brake power test at first opportunity, If felt inadequate reduce speed, clear the block section cautiously & inform PRC & check formation.
·      Ask Guard to apply brake when train Brakes not applying from Loco
·      If train is not controlled with BP dropping - Use DB (DMR should be in energized condition)
·      At normal stopping, keep A9 in Min. Reduction (more if required to hold train)
·      Release A9 only after signal is taken off
·      If brake binding experienced while starting – ensure BP continuity
Sensitivity of DV:                               0.6 kg/cm2 of BP drop in 6 seconds
Insensitivity of DV:                                      0.3 kg/cm2 of BP drop in 60 seconds
BC Pressure           will be:                            BP drop x 2.5
Maximum BC Pressure (in Wagons / Coaches):               3.8 kg/cm2
Maximum BC Pressure in loco (limiting valve setting):     1.8 kg/cm2


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...