Search This Blog

Tuesday, 6 March 2018

T/C 602– AUTHORITY FOR WORKING TRAINS ON DOUBLE LINE DURING TIC

Add caption

T/C 602– AUTHORITY FOR WORKING TRAINS ON DOUBLE LINE DURING TIC
                 Contains 3 portions;
o   Authority to proceed without Line Clear.
o   Authority to pass LSS at ON.
o   Caution Order – Speed 25 / 10 kmph Day / Night.
Ø  Trains can be started with a time interval of 30 minutes and each train is issued with this form.
Ø  Prepared in triplicate and can be manuscripted.


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...