Search This Blog

Tuesday 23 May 2017

Today’s Questions

Conflicting/blank/flickering signals to be treated as a —————-signal
a)proceed
b)Caution
c)red/danger
d)attention

What should be the speed of a train being received into station during signal failure where signal post telephone is available?
a)15 kmph
b)20 kmph
c)10 kmph
d)25 kmph

What is to be done by LP whenever the train engine is changed?
a)GDR check
b)brake power test
c)Air brake continuity
d)brake feel test


Leave sanctioned list

THE FOLLOWING EMPLOYEES LEAVE HAS BEEN SANCTIONED/REGRETTED BY DEE/CCRC/KJM   (23.05.2019) S.N   Name of t...